By Michael Abruzzi, CBO | Vice President | Code Consultants International


If you have worked in architecture for any length of time, you know that designing the building is only one part of the job.

Most architects are balancing a lot at once — client expectations, deadlines, budgets, local requirements, and codes that seem to grow more complicated every year. All while trying to keep the project moving forward.

That is one reason more firms are bringing third-party building code consultants into the process earlier than they once did.

From my years in municipal building departments to the work I do now supporting architectural teams at Code Consultants International (CCI), I have seen just how helpful it is when code gets involved early.

And the reason is pretty straightforward.

Good building code consulting is not there to create extra work.

It’s there to help projects go more smoothly.

What Building Code Consultants Actually Do

Building code consultants review a project against the codes that apply to it, then help the design team resolve the issues they find. That means working across the building code, fire code, accessibility requirements, and energy requirements all at one time, along with whatever local amendments the jurisdiction has adopted. 

In practice, the work tends to include:

  • Building code analysis covering occupancy classification, construction type, and allowable area and height
  • Building plan review of drawings and specifications at key design milestones
  • Means of egress and life safety evaluation
  • Accessibility review
  • Code summaries and permit documentation
  • Coordination with the Authority Having Jurisdiction (AHJ)

Some of this overlaps with what a design team already does. The difference is repetition. A consultant who manages building code compliance across dozens of projects each year in multiple jurisdictions brings invaluable experience to the team, along with a practical understanding of how code requirements are applied in real-world situations. 

Building Codes Keep Changing and That Creates Real Challenges

Codes are not getting any easier to manage. Most jurisdictions build on model codes like the International Building Code (IBC) and International Fire Code (IFC), along with standards such as ICC A117.1 for accessibility and the International Energy Conservation Code (IECC). Every cycle brings updates, and building, fire, accessibility, and energy requirements keep shifting.

On top of that, each jurisdiction adopts its own edition and layers local amendments on top of it. Two municipalities a few miles apart can enforce meaningfully different requirements on the same design.

Design teams already have a lot to manage with coordination and project delivery. Keeping up with every code interpretation, local amendment, and compliance issue on top of that can be a real challenge.

That is where third-party building code consultants can really help.

Because consultants work across many project types and jurisdictions, they start to see patterns. They know which questions tend to come up during permit review and which issues are most likely to slow a project down if they are not addressed early.

That kind of experience helps architects make smart decisions before small issues turn into costly delays.

Why Early Building Code Review Saves Time, Money, and Frustration

One of the biggest advantages of bringing in a third-party consultant is getting an early building code review.

I have seen projects where relatively small issues, like occupancy classification, exiting, accessibility, or fire-resistance requirements, were missed until permit review or, worse, during construction. At that point, fixing them is usually more expensive and much more disruptive.

Early review helps prevent that.

When building code analysis starts during design, the team has clearer direction before the documents are finalized.

In practical terms, third-party consultants can help teams:

  • Spot code concerns early
  • Review occupancy and construction classifications
  • Look at egress and life-safety requirements
  • Check accessibility requirements
  • Strengthen code summaries and permit documentation
  • Offer an independent technical review
  • Help reduce redesign and avoidable change orders

This is not about adding more red tape to the process.

It is about giving teams more clarity and fewer surprises.

Where a Building Code Consultant Fits in the Project

Bringing code in early is easy advice to give. What it looks like in practice depends on where the project is. We provide plan review at every design stage, from conceptual through construction documents, and the value of the work shifts as the project moves.

During schematic design, the decisions with the largest code consequences get made. Occupancy classification, construction type, allowable area and height, and the basic egress strategy all take shape here. A building code analysis at this stage gives the team a documented basis to design against, rather than a set of assumptions that have to be unwound later. As the design develops, the questions narrow to fire-resistance ratings, separation requirements, and accessibility details, and review catches those conflicts while the drawings are still fluid.

At permit submittal, a consultant can anticipate the comments a reviewer is likely to issue and address them ahead of time. Fewer comments means fewer review cycles, and review cycles are usually where schedules go sideways.

Then construction starts and field conditions change. Substitutions happen. Having someone available who knows the code basis for the original design makes those decisions faster and better documented, and it keeps inspections from turning into a negotiation.

When Standard Compliance Does Not Work: Alternate Means and Methods

An existing building could not reasonably meet a prescriptive egress requirement without significant reconstruction. The design team submitted an alternate means and methods request demonstrating that enhanced fire protection and life-safety measures provided an equivalent level of safety. The AHJ accepted the approach, allowing the project to proceed without unnecessary reconstruction.

Not every project fits neatly inside prescriptive code language. Existing buildings, unusual occupancies, and designs that push past what the code anticipated all raise questions the code does not answer directly.

That is where alternate means and methods come in. The code allows for approaches that differ from the prescriptive requirements when it can be demonstrated that the intent of the code is still being met. Getting there requires a technical case and a jurisdiction willing to consider it.

This is some of the most valuable work a consultant does. Rather than forcing a redesign to satisfy the letter of one requirement, the team documents an equivalent approach and brings it to the AHJ for review. When it is appropriate, we present code alternates for the design team to consider as part of that process.

Why an Independent Building Code Review Makes a Project Better

Some people hear “third-party review” and assume it means criticism or extra hurdles.

That is not what good building code consulting looks like.

In practice, an experienced independent review usually strengthens a project. A second set of qualified eyes can catch coordination issues or compliance concerns before they turn into comments from the jurisdiction or problems in the field.

Most architects appreciate that kind of perspective.

Not because they need someone policing their work, but because complex projects are better when there is strong collaboration and technical support.

The best projects rarely come together in isolation.

They come together through coordination.

Building Code Consulting and Building Plan Review Are Not the Same Thing

This distinction is worth drawing, because the two terms get used interchangeably and they describe different relationships.

  • Building plan review performed on behalf of a jurisdiction is a verification step. The reviewer checks a submitted set against the adopted codes and issues comments. The reviewer works for the jurisdiction.
  • Building code consulting runs the other direction. The consultant works for the design team or the owner, and the goal is to resolve issues before the set is ever submitted.

At CCI we do both. I think that is part of why our recommendations tend to land. When you have sat on the review side, you know which comments get written and why. That perspective is difficult to develop from one side of the counter alone.

At Its Core, Building Code Consulting Is About Solving Problems

At CCI, we have always seen building code consulting as a service — not just a review process.

Anyone can point to a code section.

The real value comes from helping teams apply code requirements in practical ways that support the design while still meeting safety and compliance expectations.

That is why experience matters.

Our background in municipal building departments, inspections, and building plan review runs deep — our principal spent nine years as a Chief Building Official and four as a Senior Plans Examiner and Assistant Building Official before founding the firm. That helps us understand how codes are applied in the field and how jurisdictions typically handle review and approval.

It shows up in the work too. Across the projects we have supported, the recommendations that hold up are the ones grounded in how a reviewer will actually read them.

And in today’s construction environment, practical solutions matter more than ever.

The Bottom Line

Architects bring in third-party building code consultants because projects are more demanding, schedules are tighter, and building code compliance is more complex than it used to be.

The right consultant brings more than technical knowledge. They bring perspective, real-world experience, and a genuine commitment to helping projects move forward.

At the end of the day, successful projects come down to collaboration.

A qualified building code consultant is not there to slow things down.

They are there to help teams move from design to permitting and construction with more confidence, fewer surprises, and a smoother path overall.

If you have a project where code questions are already surfacing, or one where you would rather they surfaced now than during permit review, we are glad to talk through it. Whether that is a single building code analysis or support from schematic design through final inspection. Just reach out.


FAQs

Either. Architects often bring a consultant in as a subconsultant under their own agreement. Owners sometimes retain one directly, particularly on large or phased projects. The contractual arrangement matters less than the timing. What makes the engagement work is involvement before design decisions get locked in.

No, and be cautious of anyone who suggests otherwise. The Authority Having Jurisdiction makes the final determination. What a consultant does is anticipate likely comments, document the code basis for design decisions, and resolve issues before submittal, which is why reviewed projects typically clear permitting in fewer cycles.

Not always. Straightforward projects in familiar jurisdictions often do not. Consultants add the most value on complex occupancies, unusual designs, unfamiliar jurisdictions, or compressed schedules where a permit delay carries real cost. If none of those apply, your design team may well have it covered.

Code Consultants International, Inc (CCI) provides an hourly rate. Some engagements are a fixed fee at a single design phase. Others are hourly support across the full project.

Fees vary with project size, occupancy type, and scope. Some engagements are a fixed-fee building code analysis at a single design phase. Others are hourly support across the full project. Most teams find the cost is offset by avoiding a single redesign or permit resubmittal.